Serving the Greater Detroit Area
    Cantilever Rack warehouse storage system
    Sterling Heights, Michigan

    Cantilever Rack in Sterling Heights, MI

    Cantilever rack in Sterling Heights supports plants that handle long tube, extrusions and frame components beside everyday parts. Arms on a column line hold those long pieces off the floor, with open faces for fast loading.

    Manufacturing around Mound Road, Van Dyke and the M-59 corridor often combines deep runs of one long part with many short-run profiles. The rack layout has to serve both.

    (313) 637-6214

    Why Sterling Heights Plants Use Cantilever Storage Rack

    Defense and advanced manufacturing in Macomb County uses long structural material that cannot sit in pallet rack. Cantilever storage rack gives each profile a level and keeps it visible.

    Launch programs here can add new tube sizes quickly. Adjustable arms let your team re-space levels without buying new columns.

    M-53 and M-59 freight access brings long material in on flatbeds. Placing cantilever runs near those doors keeps forklifts with long loads out of the main plant aisles.

    Our team works as a division of Warehouse Equipment & Supplies Co., supplying and installing since 1997.

    Long tube and extrusions in supplier plants
    Defense and advanced manufacturing structural stock
    Flatbed receiving near M-59 and M-53
    Programs that add new profiles often
    Cantilever warehouse racking holding steel tubing
    Cantilever rack storing lumber and wood products

    Operations We Rack Around Here

    Local industrial corridors include the Mound Road corridor, Van Dyke industrial, the M-59 business corridor, the M-59 and Van Dyke industrial corridor.

    Automotive assembly supply
    Plastics and molding
    Automation and robotics
    Light assembly

    Designing Cantilever Racking for Sterling Heights

    We start with a list of long materials, their lengths, profiles and weights. That list tells us how many columns each run needs and where the arms go.

    Arm spacing keeps long tube from bowing. The heavier and thinner the wall, the closer the arms should be.

    Capacity is checked three ways: per arm, per level and per column. A run that holds plenty on one arm can still be overloaded if every level is full on the same side.

    Double sided cantilever racking works well in the middle of large Sterling Heights plants, serving an aisle on each side. Single sided runs suit perimeter walls.

    For plants with narrow aisles, a side-loader carries long loads lengthwise down the aisle. We set aisle width to that truck's specification.

    Arm caps or end stops can be added for round tube, and decking can turn a level into a shelf for shorter pieces.

    Every drawing lists the components and ratings, and experienced installation crews we schedule and manage anchor the columns to the floor.

    Sterling Heights plants that ship to defense and automotive customers often keep structural steel on hand for months. Upper cantilever rack levels are a good reserve home for that slow stock.

    Lower levels then stay free for the material the line pulls every shift, which cuts forklift travel.

    We also mark the runs that can grow, so the next program has a planned spot.

    When selective rack already lines the walls, a Sterling Heights cantilever run usually goes in the center bay, where long loads have room to swing on both sides. That placement leaves the existing pallet positions untouched and gives the long material its own traffic lane.

    Arm spacing set to prevent bowing
    End stops for round tube
    Side-loader aisle option
    Call (313) 637-6214

    How Cantilever Rack Handles Long Tube

    1

    Profile the material

    We list each tube and extrusion by length, wall and weight.

    2

    Space the arms

    Arms are set close enough to keep long pieces straight.

    3

    Check three capacities

    Arm, level and column ratings are confirmed together.

    4

    Match the truck

    Aisles are sized for your forklift or side-loader.

    Recent Installations

    Racking projects completed for warehouses across Southeast Michigan.

    Pallet rack installation by Detroit Pallet Rack
    Pallet rack installation by Detroit Pallet Rack
    Pallet rack installation by Detroit Pallet Rack
    Pallet rack installation by Detroit Pallet Rack
    Pallet rack installation by Detroit Pallet Rack
    Pallet rack installation by Detroit Pallet Rack
    Pallet rack installation by Detroit Pallet Rack
    Pallet rack installation by Detroit Pallet Rack
    Pallet rack installation by Detroit Pallet Rack
    Pallet rack installation by Detroit Pallet Rack

    Price a Cantilever Rack in Sterling Heights

    Send your tube and extrusion list with weights and your lift truck type, and we will price a cantilever layout. Prefer to talk it through? Call (313) 637-6214.

    Detroit Pallet Rack

    19120 Grand River Ave.

    Suite C

    Detroit, MI 48223

    (313) 637-6214

    Monday - Saturday: 8:00 AM - 6:00 PM

    We respect your privacy. Your information will never be shared.

    Sterling Heights Cantilever Rack Questions

    Nearby Areas We Also Serve

    Our delivery and installation territory covers Southeast Michigan, so one team can handle multiple buildings for the same company.

    Where We Work

    Located in Detroit, we serve the entire Greater Detroit area with industrial pallet racks and warehouse storage solutions.

    Detroit Pallet Rack

    Address

    19120 Grand River Ave.
    Suite C
    Detroit, MI 48223

    Business Hours

    Monday - Saturday: 8:00 AM - 6:00 PM
    Sunday: Closed

    Need Cantilever Rack in Sterling Heights?

    Call (313) 637-6214 or request a quote and we will get a layout started.

    (313) 637-6214
    Tap to Call