Serving the Greater Detroit Area
    Carton Flow Rack warehouse storage system
    Pontiac, Michigan

    Carton Flow Rack in Pontiac, MI

    Carton flow rack in Pontiac often goes into buildings that were never meant for case picking. Former manufacturing space now holds distribution and supplier stock, and rolling lanes turn an awkward corner of that floor into an organized pick face.

    Near the former Pontiac Assembly area and along M-59 and I-75, operators inherit columns, docks and clear heights from earlier tenants. The lane layout has to work with what the building already has.

    (313) 637-6214

    Why Carton Flow Rack Suits Pontiac Re-Purposed Plants

    Pontiac buildings have changed occupants several times, and each tenant left a different storage pattern. We plan carton flow racking from today's SKU list rather than reusing a layout built for another business.

    Automotive supplier work around Pontiac still brings small parts in returnable totes. Flow lanes with return slots keep those totes moving without filling the aisle.

    M-59 and I-75 put the city within reach of most Oakland County customers. A fast case pick line helps a Pontiac building ship the same day orders come in.

    We are a division of Warehouse Equipment & Supplies Co., supplying and installing since 1997, and the layout is drawn before you commit to steel.

    Re-purposed manufacturing buildings
    Supplier totes that need return lanes
    Leftover selective rack that can take flow beds
    Same-day shippers along M-59 and I-75
    Carton flow rack with gravity wheel beds and case lanes
    Carton flow shelving in use on a warehouse pick line

    Operations We Rack Around Here

    Local industrial corridors include Centerpoint Business Campus, the Opdyke Road corridor, South Boulevard industrial, the M-59 and Opdyke Road industrial corridor.

    Light manufacturing
    E-commerce fulfillment
    Automotive supply
    Contract packaging

    Fitting Case Flow Rack Into a Pontiac Building

    1

    Fit around the building

    Bays are sized between existing columns and doors.

    2

    Load the high end

    Cases enter the rear of each lane from a restock aisle.

    3

    Roll to the picker

    Inclined rollers bring every case to a front stop.

    4

    Pick in sequence

    Lanes follow the order path so pickers move in one direction.

    Carton Flow Racking Design Steps in Pontiac

    Our first step is a floor plan with columns, docks and clear height marked. In re-purposed plants, those three items decide where the case flow rack can go.

    Next is the item list. Case sizes, weights and daily picks tell us how many lanes each SKU needs and how wide they should be.

    Many Pontiac buildings still have older selective rack left behind. If those frames check out, flow beds can go between the beams and save the cost of new uprights.

    We set roller pitch and spacing to the product. Totes with ribbed bottoms, corrugated cases and shrink-wrapped bundles all ride differently.

    Return lanes are added where totes or bins are reused. That keeps empties off the floor and back at the loading side.

    The final drawing marks every lane and aisle, and experienced installation crews we schedule and manage build it to that plan.

    Leftover pallet positions above the pick face can hold reserve cases, so restocking a Pontiac carton flow rack lane is a short trip rather than a walk across the building.

    Lighting is worth checking too. Older plants sometimes have dim aisles, and a pick face reads better when labels are not in shadow.

    We flag those issues on the drawing so your team can address them before installation.

    Pontiac buildings with uneven older floors need a level check before installation. Frames are shimmed as needed so every lane keeps its intended pitch from back to front, and cases do not drift to one side.

    Layout drawn around existing columns
    Frame check before any retrofit
    Roller spacing matched to your containers
    Call (313) 637-6214

    Recent Installations

    Racking projects completed for warehouses across Southeast Michigan.

    Pallet rack installation by Detroit Pallet Rack
    Pallet rack installation by Detroit Pallet Rack
    Pallet rack installation by Detroit Pallet Rack
    Pallet rack installation by Detroit Pallet Rack
    Pallet rack installation by Detroit Pallet Rack
    Pallet rack installation by Detroit Pallet Rack
    Pallet rack installation by Detroit Pallet Rack
    Pallet rack installation by Detroit Pallet Rack
    Pallet rack installation by Detroit Pallet Rack
    Pallet rack installation by Detroit Pallet Rack

    Price Carton Flow Rack for Your Pontiac Building

    Send your floor plan with columns marked and a list of items to pick, and we will draw the carton flow layout and price it. Prefer to talk it through? Call (313) 637-6214.

    Detroit Pallet Rack

    19120 Grand River Ave.

    Suite C

    Detroit, MI 48223

    (313) 637-6214

    Monday - Saturday: 8:00 AM - 6:00 PM

    We respect your privacy. Your information will never be shared.

    Pontiac Carton Flow Rack Questions

    Nearby Areas We Also Serve

    Our delivery and installation territory covers Southeast Michigan, so one team can handle multiple buildings for the same company.

    Where We Work

    Located in Detroit, we serve the entire Greater Detroit area with industrial pallet racks and warehouse storage solutions.

    Detroit Pallet Rack

    Address

    19120 Grand River Ave.
    Suite C
    Detroit, MI 48223

    Business Hours

    Monday - Saturday: 8:00 AM - 6:00 PM
    Sunday: Closed

    Need Carton Flow Rack in Pontiac?

    Call (313) 637-6214 or request a quote and we will get a layout started.

    (313) 637-6214
    Tap to Call